成人综合色网-成人综合色欲久久久久-成人综合网在线-成人综合一区-成人综合永久-成人综合在线网

Effective measures to deal with the pollution of stone curtain wall veneer

Date: 2023-10-23

Read: 3743

Response to white pollution
The dry hanging construction method can effectively avoid the problem of whitening, but considering the high cost of stone dry hanging, it is mainly used for the external walls of good buildings. For some small and medium-sized buildings, wet construction of the bottom stone hanging, while the stone to take protective treatment, that is, the back and sides of the stone injected resin, to avoid alkaline cement mortar and stone contact, play an isolating role, stone holes are also closed, effectively prevent water infiltration. In addition, the back of the stone becomes a sticky hairy surface, which can be better combined with cement mortar. When fixing the SLATE, apply the gap at the joint of the two plates evenly with glue, which can improve the tightness and effectively prevent water seepage. Mix the low-alkali cement with the sand in a ratio of 1:3.

Response to rust stain contamination
The board before installation is thoroughly cleaned to remove iron residue and rust, and the resin is injected into the stone for waterproof treatment to prevent the iron minerals inside the stone from being oxidized and leaking to the surface. Try to use dry hanging construction method, use stainless steel accessories. Use protective paint to paint other iron products on the wall and maintain them frequently to prevent rust.

Water stains, wet marks pollution response
As far as possible, the dry hanging construction method is used to waterproof the permeable areas such as balconies and wall bases, giving the stone a new feature of waterproof and antifouling, which can effectively avoid the occurrence of water spots.

Response to frost damage pollution
The stone will lose its surface luster after being damaged by frost damage, and in serious cases it will break after the force impact, resulting in falling accidents. The countermeasures are mainly to inject resin into the stone to make it waterproof, if it is wet construction, it must also take a more comprehensive resin injection of the stone, and the sealant caulking project is also more necessary.

Stone cracking pollution response
The marble to be hung on the exterior wall is pre-cured, and the marble block by block is treated with strengthening agent. The hardness of the stone has been effectively improved, the natural luster of the surface is brighter, the weather resistance is better, and the service life is longer.

Response to bryophyte growth and microbial damage pollution
Water is the main factor for the growth of plants and microorganisms, so to avoid pollution, we must first do a good job of stone drainage measures, followed by the protective agent into the stone interior, the protective agent can not only effectively protect, but also strengthen the stone and increase the bond strength.

Top

主站蜘蛛池模板: 日本一本二本三区免费2025 | 日韩免费专区 | jizz护士高清 | 国产永久免费高清在线 | 欧美另类国产精品一区二区在线 | 国产自产拍精品视频免费看 | 国产精品免费αv视频 | 亚洲精品蜜桃 | 欧美精品在线 | 国产亚洲日韩欧美另类第八页 | 亚洲色大成 | 日韩一区二区欧美精品 | 日本三区视频 | 精品国产亚洲一区二区在线另类 | 成人精品视频99在线观看免费 | 国产精品敌一区二区三区 | 日本精品欧美一区二区三区 | 亚洲精品一区二区国产精华液 | 成人3d动漫在线观看网站 | 国产免费一区二区三区香蕉精 | 国产精品亚洲а∨天堂免下 | 欧美精品在线播放 | 99热这里只有精品23 | 亚洲精品午夜不卡在线播放 | 97影院在线观看 | 欧美黑人巨大videos精品 | 国产精品视频一区二 | 国产精品视频一区二区 | 免费日韩精品 | 日本加勒比国产在 | 又粗又大又硬又爽的免费视频 | 国产精品r级在线 | 羞羞视频网站 | 日本免费一区二区视频 | 亚洲欧美另类在线观看一区二区 | 日本国产在线视频 | 奇米网7777| 国产一级午夜大片 | 欧美激情一区二区三区中文字幕 | 日韩aⅴ免费精品一区二区三区 | 日韩国产一区二区中文字幕 |